- Contact Person : Mr. Shen Austin
- Company Name : Jiangyin Broadenwin Machinery Co., Ltd.
- Tel : 0086-510-86055338
- Fax : 0086-510-86659338
- Address : Jiangsu,Jiangyin,No.19 Xiaohu RD, Huangtu Industrial Zone, Jiangyin City, Jiangsu Province, China
- Country/Region : China
- Zip : 214445
Related Product Searches:s-roll calender machine,High Quality,s-roll, kuster,BRW60-180
Principle
A steel tube rotates around the fixed axle. The circular gap is separated by two seals in two semi-circular chambers. The chamber facing the nip is hydraulically pressurised by oil. Line pressure can be adjusted by controlling the oil pressure in the two semi-circular chambers, thus ensure a even calender effect.
1.Even linear pressure across
2.Pressure reduced at center of rolls
3.Pressure increased at center of rolls
4.Pressure raised on one side of the rolls
Stepless pressure regulation S-Roll calender
Main applications:
l Luggage and Backpacks, Parachutes, Kites, Sailing boat, Umbrellas, Beach chairs, Tents.
l Mountain wear, Ski wear, Sports wear, Motorcycle suits,Casual wear, Car-racing suits, Wind coats, Snow suits, Jackets, etc.
l Military and police uniforms, caution articles, fire-fighting uniforms,life jackets, racing clothes, IT suits, special work clothes, labor protection articles, etc.
Main features:
l Utilize the stepless pressure regulation S-Roll, achieve the uniform line pressure by adjusting the oil pressure in the two semi-circular chambers.
l The elastic roller sleeve coated on the stepless pressure regulation S-Roll roller can better recover the deformation of the roller.
l The S-Roll roller is controlled by hydraulic system.
l The S-Roll roller is auxiliary driven by oil motor.
l HMI (Whole machine monitoring, process parameter settings, seam detection animated display, hydraulic system pressure display, fault diagnosis, alarm information)
l Roller sleeve change is quick and easy, no need to have a large-scale demolition, the soft roller sleeve made of synthetic material can be exchanged from the side pipe rack of the calender, to minimize the downtime. The sleeve can be selected in calendering process(such as calendering, electro-optical, embossing, soft calendering and silk finishing).
Advantages:
l Universal joint drive to reduce wear and ensure the stationarity.
l To get the friction calendering effect and the glazing effect. By adjusting the pressure, temperature, speed.
l Highly resistant to surface marks of the elastic roller can take the place of the supporting roller of the multi-roll calendering, this performance make the two-roller or three-roller S-Roll calender can achieve the calendering effect of the traditional four-roller or five-roller calender.
l The fabric calendered one time can achieve the effect which should be processed four times by ordinary calender.
l High efficient squeezing effect, significant effect on the downproof and air permeability of the fabric.
Main technical parameters
Pattern
1.Vertical two rollers, the top roller is the heating mirror roller, the bottom roller is the stepless pressure regulation S-Roll.
2.Vertical three rollers, the top and the bottom are the stepless pressure regulation S-Roll, the middle is the heating mirror roller.
Max line pressure between rollers
400N/mm
Serial NO. | Items | Contents |
1 | Pattern | Vertical two rollers, the top roller is the heating mirror roller, the bottom roller is the stepless voltage regulation uniform roller. Vertical three rollers, the top and the bottom are the stepless voltage regulation uniform rollers, the middle is the heating mirror roller. |
2 | Norminal Breadth (mm) | 1800,2000,2200,2400,2600,2800,3000,3200,3400,3600 |
3 | Running speed | 5-50m/min |
4 | Max line pressure between rollers | 400N/mm |
Factory Overlook
Certificates
Workshop
Enterprise Management
Service Process
A. To introduce the characteristics of products, slove the questions raised by customers in brief and record the special requirements of customers.
B. To supply several solution to customers for reference according to the requirements of customers and offer prices depending on different solution.
C. To decde the final scheme and sign the contract.
D. According to the final Scheme, organize the operation and offer customers the installation drawing. Send the engineer to prospect on spot, if necessary.
E. After the equipment arrives on site, our engineer shall provide a free instruction in erection on site, debugging after installation and technical training.
F. After we received the telephone from customers, we will try our best to instruct customers to solve the problem; if customers really cannot knock over the engineers shall arrive on site a minute earlier as soon as possible and prevent from fear of disturbance in the rear:
In China a. Within 500 kilometers, the engineer arrives within 24 hours at the latest;
b. Within 1000 kilometers, the engineer arrives within 48 hours at the latest;
c. Beyond 1000 kilometers, the engineer arrives within 72 hours at the latest;
G. Within the year when the equipment is brought into operation, our after-sales engineers shall repay visits customers at irregular intervals and give suitable suggestions to customers for reference, according to the actual use. Meanwhile, we will ask customers for suggestions for improvement, so that we will make long-term progress in technology.
s-roll calender machine